In the beginning... 9-9-2008, there was only the forest...
9-11-2008 The loggers arrive...
Local Crew & Site Watch Dog
|
|
9-23 to 9-27-2009 Site work and the pad outline takes shape
Sneak peek: The stained-glass dome with dragon fly design for the ceiling of the main room
9-30-2008 Cleaning up the retention wall and the pad in preparation for concrete
(Sneak Peek: The dimensions of the first floor is 36 ft. by 36 ft. with a second floor.)
10-3-2008 Who's that man in the 'hole'?
The crushed rock base is laid and ready to pour concrete. Most important the porta-potty is there!
Ta-Taaaaaaaa....another sneak peak, this time the building plans
The over-view, present house (shaded) on left, the addition (floor plan) on the right with the walkway between
Exterior elevations: front, both sides, and rear
Interior floor plans with the 'Grand Staircase' and showing the 'Dragonfly' ceiling dome
Proceed to: Page Two
Page One | Page Two | Page Three | Page Four | Page Five | Page Six
| Page Seven | Page Eight | Page Nine | Page Ten | Page Eleven | Page Twelve | Page Thirteen
Page Fourteen | Page Fifteen | Page Sixteen
Final photos of interior and exterior 1-2010