
Page Six
11-4-2008: The roof is being dried-in and much of the work will now be inside.
12-2-2008: Hand hewn beams at entryway, roof pyramid being placed, heating and air-conditioning
12-3-2008:
Looking up into the sky-light pyramid on the roof
Proceed to: Page Seven
Page One | Page Two | Page Three | Page Four | Page Five | Page Six
| Page Seven | Page Eight | Page Nine | Page Ten | Page Eleven | Page Twelve | Page Thirteen