Page Seven
12-15-2008
Work on the electrical and interior is underway, but it's very cold, so things have slowed down the past few days. The covers are in place so the contractor can work on the exterior coating. Doors are being installed to help control the temperature inside.
12-22-2008
The exterior is now uncovered to show the new surface decor.
Work is underway on the electrical, heating, and lighting inside.
1-26-2009
The stairs are in and the big screen TV seating section is under construction.